logo

5G Site Power Upgrade Project for Overseas Operator

March 23, 2026

Laatste bedrijfscasus over 5G Site Power Upgrade Project for Overseas Operator
Project Overview
An overseas telecom operator was expanding its 5G network, facing challenges such as insufficient power of traditional equipment, weak monitoring, difficult expansion, unstable grid supply, and demands for green low-carbon operations and rapid deployment.
Solution (Beijing Ding Ding Future Technology)
  • Core Equipment Room: 48V 168KW High-power DC Power System (high-reliability redundant design)
  • Indoor Sites: Flatpack2 48V 84KW Integrated Cabinet Power (OEM customization + rapid deployment)
  • Edge Nodes: Eltek 24-32KW Embedded Power System (intelligent monitoring + plug-and-play)
  • Remote Sites: Hybrid Solar Power System (solar-storage integration + cost & emission reduction)
Core Advantages
High Reliability: System availability ≥99.99%, ensuring uninterrupted services
Intelligent O&M: Remote monitoring, reducing on-site inspections by 50%+
Flexible Delivery: MOQ 1 set, customized adaptation + fast supply
Green & Efficient: High conversion efficiency, solar solution reduces carbon emissions
Implementation Results
  • Significantly improved power supply stability and reduced downtime
  • Considerable annual energy savings per site and lower O&M costs
  • Rapidly adapted to 5G construction cycles, becoming the operator’s preferred supplier
Neem contact op met ons
Contactpersoon : Mr. Lee
Tel. : 0086-13011182266
Fax : 86-010-80303109
Resterend aantal tekens(20/3000)